Grid capacity has become the bottleneck of the energy transition. Renewable projects and new industrial demand are queuing for connections that take years to build, while the retirement of conventional power plants removes the inertia and voltage support that keep the grid stable.
The Green Power Station is our answer. It combines a high-voltage substation, a grid-forming Power Conversion System and at least four hours of energy storage based on LFP battery technology. Renewable producers and large consumers connect to it by direct line and share one grid connection, controlled around the clock from the WeStorix Energy Management & Trading Center.
The result is one connection point, many producers and consumers, and one optimized system: more renewable power used locally, more capacity for industry and stronger support for the public grid.
Read more on the Green Power Station page, where the architecture is shown step by step.