Projects

Projects that prove the concept

WeStorix is developing more than 2 GWh of energy storage with grid-forming power conversion in Denmark. Each project is developed in a dedicated project company, on one reference design, and operated by the WeStorix Energy Management & Trading Center.

SATURN Hirtshals

Port of Hirtshals, North Jutland · 150 kV

grid connection
150 MW
grid-forming PCS
92 MW
energy storage
375 MWh
In development · operation targeted 2029

Read more about SATURN Hirtshals

SATURN Vejle

Vejle North East, Triangle Region · 150 kV

grid connection
100 MW
grid-forming PCS
65 MW
energy storage
262 MWh
In development · interim operation 2027

Read more about SATURN Vejle

TITAN

Utility-Scale Hybrid Energy Hub, Denmark

grid-forming PCS
368 MW
energy storage
1,5 GWh
solar
~365 MWp
In development · operation targeted 2029

Read more about TITAN

Project SATURN and TITAN

Three Green Power Stations in Denmark

Project SATURN consists of two Green Power Stations – in Hirtshals and Vejle – built on one reference design. Together they add 250 MW of grid capacity at 150 kV, 157 MW of grid-forming PCS (92 MW + 65 MW) and 637 MWh of energy storage in two regions where grid capacity is scarce. Both stations are designed as Energy Hubs, connecting local renewable generation and industrial demand behind one connection point.

Project TITAN is the third station and shows how far the platform scales. It combines about 365 MWp of solar PV with a BESS of 368 MW grid-forming PCS and 1,5 GWh of energy storage behind a single transmission-level grid connection, and supplies a data center of around 150 MW by a dedicated high-voltage direct line.

Together, the three stations add 535 MW of grid capacity at 132-150 kV, 525 MW of grid-forming PCS and 2.137 MWh of energy storage. The final investment decision is targeted for the end of 2026 for all three, with construction from 2027.

Project SATURN and TITAN: targeted timeline 2025–2029 Targeted timeline for the three Green Power Stations in Denmark. SATURN Hirtshals: grid screening agreement in late 2025; final investment decision targeted for the fourth quarter of 2026; construction over 22 months in 2027 and 2028; operation from 2029. SATURN Vejle: site secured in 2026; final investment decision targeted for the fourth quarter of 2026; construction in 2027 and 2028; interim operation at 60 kV from 2027; full operation at 150 kV from 2029. Project TITAN: final investment decision targeted for the end of December 2026; construction in 2027, 2028 and until the second quarter of 2029; operation from 2029. Dates are targets and subject to permits and financing. 2025 2026 2027 2028 2029 SATURN Hirtshals SATURN Vejle Project TITAN Grid screening agreement FID Construction · 22 months Operation Site secured FID Construction Interim 60 kV operation 150 kV · full operation FID · end December 2026 Construction · until Q2 2029 Operation FID = final investment decision, targeted Q4 2026 for all three projects. Dates are targets and subject to permits and financing.
Text description of this illustration

Targeted timeline for the three Green Power Stations in Denmark. SATURN Hirtshals: grid screening agreement in late 2025; final investment decision targeted for the fourth quarter of 2026; construction over 22 months in 2027 and 2028; operation from 2029. SATURN Vejle: site secured in 2026; final investment decision targeted for the fourth quarter of 2026; construction in 2027 and 2028; interim operation at 60 kV from 2027; full operation at 150 kV from 2029. Project TITAN: final investment decision targeted for the end of December 2026; construction in 2027, 2028 and until the second quarter of 2029; operation from 2029. Dates are targets and subject to permits and financing.

Pipeline

European and global pipeline

Two to three Green Power Stations a year, developed in parallel rather than sequentially.

Beyond the three projects in Denmark, WeStorix has identified further sites in Europe and other regions, working closely with local grid operators, municipalities and industry.

Global pipeline, storage capacity
12,1 GWh
Identified sites across four regions
24
New Green Power Stations per year (target)
2-3
Pipeline by region: storage capacity Bar chart of the WeStorix pipeline by region, in megawatt-hours of storage capacity. Denmark: 2.137 MWh across 3 sites. EMEA: 5.850 MWh across 13 sites. APAC: 2.325 MWh across 5 sites. AMER: 1.800 MWh across 3 sites. In total about 12,1 GWh across 24 identified sites in four regions. Pipeline by region - storage capacity, MWh 0 1.000 2.000 3.000 4.000 5.000 6.000 7.000 2.137 Denmark 3 sites 5.850 EMEA 13 sites 2.325 APAC 5 sites 1.800 AMER 3 sites
Text description of this illustration

Bar chart of the WeStorix pipeline by region, in megawatt-hours of storage capacity. Denmark: 2.137 MWh across 3 sites. EMEA: 5.850 MWh across 13 sites. APAC: 2.325 MWh across 5 sites. AMER: 1.800 MWh across 3 sites. In total about 12,1 GWh across 24 identified sites in four regions.

Need grid capacity, flexibility or firm green power? Let’s talk.