TITAN

Utility-Scale Hybrid Energy Hub, Denmark · In development · operation targeted 2029

TITAN shows how far the Green Power Station platform scales. It combines utility-scale solar generation with a BESS of 368 MW grid-forming PCS and 1,5 GWh of energy storage behind a single transmission-level grid connection – and supplies a data center of around 150 MW by a dedicated high-voltage direct line.

  • About 365 MWp of solar PV.
  • 368 MW of grid-forming PCS and 1,5 GWh of energy storage based on LFP battery technology.
  • A transmission-level grid connection of close to 300 MW.
  • One dedicated high-voltage direct line to a data center of around 150 MW, with the option of a second.
  • Optional emergency power capacity and heavy-duty truck charging.
  • Generation, storage and demand dispatched as one system; operation targeted 2029.
Project TITAN: concept Concept diagram of Project TITAN. At the top, a 132 kV transmission-level grid connection of close to 300 MW runs from the transmission grid to the high-voltage substation inside the Green Power Station and Energy Hub, and one dedicated 132 kV direct line, with an option for a second, runs from the substation to a data center of around 150 MW. The substation feeds a medium-voltage busbar below it. Connected to that busbar are about 365 MWp of solar PV, on site and owned by WeStorix, and a BESS of 368 MW grid-forming PCS and 1,5 GWh of LFP energy storage. A medium-voltage direct line runs straight from the busbar to heavy-duty truck charging. No site or partner details are shown. Green Power Station and Energy Hub 132 kV ≈ 300 MW 132 kV direct line Medium-voltage busbar BESS - integrated system AC DC HV substation EMS Solar PV ~365 MWp · on site, owned by WeStorix 368 MW grid-forming PCS 1,5 GWh LFP energy storage Transmission grid Transmission grid 132 kV Demand by direct line ~150 MW data center One 132 kV direct line, with an option for a second Heavy-duty truck charging Medium-voltage direct line 132 kV connection, direct line and busbar AC power and medium-voltage direct line Solar generation
Text description of this illustration

Concept diagram of Project TITAN. At the top, a 132 kV transmission-level grid connection of close to 300 MW runs from the transmission grid to the high-voltage substation inside the Green Power Station and Energy Hub, and one dedicated 132 kV direct line, with an option for a second, runs from the substation to a data center of around 150 MW. The substation feeds a medium-voltage busbar below it. Connected to that busbar are about 365 MWp of solar PV, on site and owned by WeStorix, and a BESS of 368 MW grid-forming PCS and 1,5 GWh of LFP energy storage. A medium-voltage direct line runs straight from the busbar to heavy-duty truck charging. No site or partner details are shown.